Romania

Crystal Tower

https://alukoenigstahl.md/en/wp-content/uploads/sites/6/2020/09/ct20.jpg

System Features

Type of building
Office- and administration building
Products
Schüco FW50+ Schüco AWS 70.HI
Location
011745 Bucharest Romania
Completion date
2011
Architect
Adrian Spirescu
Client
Search Corporation Ltd
Specialist company
Mimo SRL
Picture credits
AluKönigStahl GmbH

This project won the 2012 Architecture Competition in the category “Socio-Cultural Buildings”, the “Green Design of the Year” award (Romanian Green Building Council), and first place in the BREEAM-Building Awards (category office buildings).  The specific project requirements for the Crystal Tower were the construction of a double façade to include facets cut into unequal angles. The planning at this level of detail was made possible through the constant support of the structural engineering services Alukönigstahl. ​

Other

References